Embracing Industry 4.0 Digital Transformation

Published January 2019

Greg Vance (Rockwell Automation)

Mikica Cvijetinovic (Rockwell Automation)

Francisco P Maturana (Rockwell Automation)

Balamurugan Balakreshnan (Microsoft)

Michael Walton (Microsoft)

Stephen Philip (Microsoft)

  • Introduction Table of Contents
  • Pick and Place Nozzle Failure
  • Process Overview
  • Solution Overview
  • Remarks
  • References
  • Disclaimer:

In our vision of smart manufacturing, we leverage the best technology blends to achieve Digital Transformation on the plant-floor processes to facilitate operational data integration with the rest of the enterprise. We envision this transformation as a leap step into an ecosystem of tools and information that will make data acquisition and integration more accessible for analysis.

Smart manufacturing requires quick decision making in which product and process performance needs to be monitored proactively to prevent excessive downtimes and failures. To proactively monitor such systems, there is a need to generate contextualized data out of the physical environment in various volumes and frequencies so enough data can be collected for trending and root cause analysis. Typically, data resides in disparate locations ( e.g. databases, machines, gateways, etc.) and behind proprietary interfaces and firewalls, making data integration a daunting task.

State-of-the-art systems require users to go to individual machines to pull data to establish a meaningful data integration and actionable information from it. Moreover, if the intended analysis requires data assimilation with other production data or even transactional or supply chain data, engineers often must run queries that need to be associated and merged before it can be analyzed in an offline manner. This is a task that makes data analysis costly and slow, while making effective real-time data analysis difficult, too late, and expensive.

In our vision of smart manufacturing, we leverage the best technology blends to achieve Digital Transformation on the plant-floor processes to facilitate operational data integration with the rest of the enterprise. We envision this transformation as a leap step into an ecosystem of tools and information that will make data acquisition and integration more accessible for analysis.

We observed the component placement operation (aka pick and place operation) of an electronic assembly manufacturing plant. The pick and place operation is a critical step in the manufacturing of printed circuit boards (PCBs). It is a data rich operation in the overall process with multiple vacuum-based nozzles picking and placing the components onto PCBs. Pick and place data is collected directly from the machine’s database. Our intention is to leverage this data-rich environment to create knowledge and capture insights that can be converted into valuable information for the operators and plant support to help them apply corrective actions for maximizing throughput and minimizing potential defects in the product. The challenge is the know-how to

implement an information backbone that will permit observing the process in application real time and to generate insights on-the-fly, so operators can be notified in a timely manner about potential perturbations in the process. Furthermore, the interest is in keeping the attention of the operators on the process itself rather than having them paying attention to monitors waiting for deviations to occur.

The ability to leverage AI based machine learning allows for advanced notification of a nozzle/spindle/head failure, giving the plant the chance to modify their maintenance team prior to failure. As all this monitoring, troubleshooting, and restart actions translate into downtime and therefore affecting the overall process OEE, the objective of this new way to analyze data is to minimize such a downtime by controlling the variables based on the new information. Our belief is that data analysis can help to accelerate the time- to-realization of this endeavor.

In this work, we present initial steps in the direction of automated data acquisition, data harmonization, storage and processing capacity that will use the best of the cloud computing environments to achieve the smart manufacturing vision on a legacy electronic assembly manufacturing system. We propose using this high-performance computing setting to create actionable analytics and visualization around the electronic assembly processes by measuring machine performance at scale and in application real time. This solution will allow the machine operators and production engineers to identify potential outliers in the production processes as they emerge and to unveil product quality tendencies that can be resolved faster and with anticipation.

Pick and place is a machine process within an automated assembly line that produces circuit boards in an electronic assembly manufacturing plant, as shown in Figure 1. These are very sophisticated machines that can be programmed to populate various sizes of circuit boards based on product requirements.

The pick and place operation consist of picking electronic components/parts from a tape or tray, taking an image of them to identify the placement centroid and then placing them in the appropriate location on the PCBs as directed by a placement program. The nozzles mount to various spindles contained within a head that moves at a high speed. Nozzle vacuum degradation (clogging or mechanical defect) increases the likelihood to miss-pick/scrap components and increases the potential of a defect in the electronic assembly. This equipment is robotically controlled and can be programed to optimally meet the board-layout requirements. The real challenge is to be able to leverage the knowledge conveyed in the generated information that is extracted during this operation to learn potential defects and other tendencies of interest, yet to be discovered.

Figure 1 - Electronic assembly line

An area where improvements can be made is minimizing the rate of the failure to pick and place components. If a nozzle starts to fail, it tends to miss-pick components. As this error rate increases it can cause downtime and reduces the operation efficiencies as well. By detecting and/or predicting the failure/degradation of the nozzles, it will facilitate alerting support personal to proactively troubleshoot the nozzle(s) before they become a significant problem. Early detection also minimizes the opportunity to introduce defects into the product.

This pick and place equipment handles about 1–30 nozzles per head and there are one to four heads with nozzle changers with some number of nozzles. When a nozzle fails, it can take a significant amount of time in troubleshooting to determine the specific nozzles that need replacement. One goal is to be able to control downtime by anticipating the nozzle failure. Knowing when it can fail will transform the maintenance process into a proactive activity based on factual calculations and higher certainty.

One of the main concerns here is also to avoid false positives or false alarming to avoid overwhelming the operators with false alerts.

If we can avoid any defect here it will save the manufacturer on rework. Also, there are components like Integrated Circuit (IC) chips where only one side can be soldered. So, the component placement is very critical. The Pick and Place is a critical machine in the line where there may be 1 or more machines in the line based on the product physical requirements.

Sometimes the components are placed shifted or skewed on the board which will cause defective boards after permanent assembly (soldering). A whole panel holding multiple electronic assembly modules might need rework which can take 1 to 48 hours, depending on what the defects is. Position issues can be detected in downstream inspection stations such as the Automated Optical Inspection (AOI) machine while electrical issues are only detected at the final stage at functional integrated circuit testing, where the boards are already assembled. All these defects affect the OEE of the plant.

The Plan to tighten Nozzle Performance

We assembled a team of AI enthusiasts to create a way of solving the machine- performance prediction challenge. The team consisted of business personnel and architects working together to analyze and design a solution. The team decided to solve the solution by incrementally building up analytics with AI and Machine Learning approaches.

A descriptive-analytic based solution was initially built to establish a data governance and analytic platform for visualizing the natural behavior of the machine, nozzle, and process per build order, as show in Figure 2. The team learned the nozzles’ behavior and accumulation of defects by observing nozzle-cumulative patterns and performance metrics indicators, directly from the data. Based on this primary knowledge of the nozzle behavior, the team was able to define a predictive monitoring algorithm which required leveraging a modern high-performance computing workbench with AI helpers and parallel data processing engines.

Figure 2 - Descriptive-analytic machine performance

Governance from the point of view of data flow, security, usability and data preparation were fundamental steps for achieving a clear view of the performance. For example, a significant amount of time was required to establish an understanding of the data and a methodology to suppress the noise.

The Pick and Place data is configured to refresh every 15 minutes. Each chunk of data per machine is automatically moved to a data lake repository in the Cloud via a plant- floor level gateway. The data lake was built using big data components such as Hadoop, Spark, and Kafka. In the data lake environment, several micro services were created to handle data governance, ETL, and analytics. Classical data wrangling and data transformation (supported by spark-based services) were accomplished in the data lake level. A separate folder contains the curated data for further model development. Power BI was used to visualize the data from different perspectives and analysis, constituting the analytic and reporting dashboards.

To facilitate the data organization and selection of significant parameters, the team collected human operator experience to incorporate additional heuristics into the design of the predictive solution. Several interviews with the operators took place to gain insights about other aspects that could also be affecting the pick and place performance. After the interviewing process, the team collected the data and was able to chart the performance and envision important data correlations.

It was discovered that a higher accumulation of miss-picks and misplacements always correlated to a configuration of the nozzles that could be analyzed from a cumulative- tendency perspective, and where instantaneous measurements were not enough to unveil the anomalies causing the defects. We learned that the nozzle position relative to its cumulative rejects is an important indicator. This insight led the team to think in the direction of an AI-based algorithm that could learn and trace the behavior of individual nozzles, as shown in Figure 3.

Figure 3 - Forecast nozzle tendency

We first established a slope-based identification algorithm to detect the outliers. We then began operationalization of an AI/Machine Learning algorithm to forecast the future state of the nozzles in this subset of outliers for which case we looked at AI techniques to automate the discovery process.

After collaborating with expert data scientists, we tested a set of algorithms such as, ARIMA and Temporal Difference Methods (TD) for Reinforcement Learning as the primary Machine Learning techniques to predict the nozzle behavior. Since this type of failure is based on time, we needed a time series-based Machine Learning algorithm.

ARIMA: This is a time series analysis. It stands for Auto Regressive, Integrated, Moving Average. The intuitive premise of this model is that the prediction in the next time step is informed by a variable, n past time steps in the past. Auto Regressive refers to the fact that a shock to the system could be more slowly absorbed, and Moving Average follows a behavior where shocks to the system (e.g., excess demand) is rapidly absorbed. These two behaviors tend to interact in a juxtaposed fashion. To understand which is which, we analyzed charts of Partial Auto Correlation Functions (PACF) for auto regressive behavior and Auto Correlation Functions (ACF) for moving average behavior. The “I”, in ARIMA stands for a differencing function, where we can sometimes use this to stationarize a series. The intuition behind stationarity is that the future behavior will be like the past, so the data cannot vary over time, and if it does, we must stabilize (stationarize) the series during training, and then add back any stationarizing modifications we made

when we predict. The next step is to try a multivariate ARIMA as we used a univariate method for the nozzle positioning.

Reinforcement Learning-Temporal Difference (TD) methods: After the business described the behavior of the nozzle, we concluded this fits the behavior associated with temporal difference models and Markov Chains. We chose an algorithm called TD Lambda, which suits paradigms where each successive time step reveals more about the time step in the future we are trying to predict. A good example is weather, where on Monday trying to predict Saturday’s weather is less accurate than predicting Saturday’s weather on Wednesday. In between Monday and Wednesday, you have more information revealed by the system to factor in, so we can update our predictions. TD Lambda uses Markov chains, which are a series of states (positions) that have a transition probability to the next state. We obtain a Maximum Likelihood Estimate (MLE), that tells us where the nozzle is likely to be in the future, based on its current position. The likelihood of the nozzle being at this state is the MLE, which is based on Bellman’s Equation of Optimality, affectionately referred to as the Bellman Equation. Lambda is a hyperparameter that can be tuned to manage decay of eligibility traces. This simply means that we can adjust how important past timesteps are to find the true behavior of our system.

Prior to AI/ML implementation, we carried out a validation of the slope-based prediction algorithm. An initial prototype was designed and validated in Azure Databricks notebook using Spark Scala programing languages. Production data was collected from data lake repository in a raw format. The Databricks notebook was used to figure out all the steps to convert the raw data into a usable data set that could be injected into the AI/ML model. The nozzle outlier detection algorithm triggered alarm notifications into an Azure notification hub, where the messages were directed to the maintenance team at the Rockwell Automation production plant, as shown in Figure 4.

Next step is to build the AI/ML model, a deployment plan has been designed to bundle the Spark-Scala model into a deployable solution that can be executed in the data lake environment in production. This bundle will connect to the pick and place data streams to execute the analysis and notification in real time.

As the solution matures, production implementation will continue to grow. Since this is an AI process, a continuous learning cycle will be introduced to batch train the model monthly with the new data points and make the model more robust and accurate. As the model gets more robust, the new model will be deployed to the plant. The score results for various models will be stored in a central location to other validation purpose.

Figure 4 - Azure Databricks-based development

A proper development lifecycle will be applied to the process. Moreover, a development pattern will be established from this effort that can be applied to other machine learning use cases.

During Pilot runs of the Nozzle Monitoring solution (pre AI/ML), we saw several improvements related to Productivity and Cost Savings due to earlier detection of nozzle related issues:

 Significantly more detection of a bad nozzle. For example, after analyzing historical data, it was not uncommon to run on a degraded nozzle for up to 2 weeks, accumulating 6,000 or more miss-picks before a successful diagnosis by a technician. Along the way, there would be several log-downs accruing hours of downtime, and it was found to be common that a bad nozzle would be re-installed after inspection if clear damage was not observed. Early identification of a nozzle concern is descriptive, as it points the technician directly to which nozzle on the machine that is performing poorly, saving on average 30 minutes of troubleshooting time which translates directly to downtime. Productivity, each miss-pick average ~1.5 seconds of lost productivity. Severe cases cause constant machine stoppage as the machine detects it has run out of parts, when in fact, it cannot pick parts successfully. These interruptions impact line efficiency up to 15%. Reduction of scrapped components. Each miss-pick is essentially a scrapped component that accumulates the cost of operation. Reduction of expensed items by letting the performance of the nozzle dictate when it needs to be inspected and replaced. Nozzles are wearable items that are often replaced. It was found to be common for a good nozzle to be replaced because it was believed to be bad after visual inspection, or the process of elimination has replaced a good nozzle. Reduction of defects by removing the threat of a degrading nozzle. Further, defects and performance issues are caught near the process origin as they occur, which gives insight to correct issues before a backlog is found at a later operation.

As we move into AI/ML development, we expect to be able to detect the failure of a nozzle before it occurs. If proven successful, we expect the above points to provide even more value to production.

Additionally, storing historical data, along with the other data that has been collecting in the data lake has provided other benefits in the analytical space. We have established other historical and near real time dashboards to track and analyze historical trends

without the need for an engineer to spend hours data mining in Excel, but rather exploring a comprehensive data model in a dashboard. This minimizes the non-value- add time an engineer spends and provides insight to opportunities in minutes.

11 An Intelligent, AI Process Control Solution for Automated Pick and Place Equipment in Electronic Assembly

[1] Learning to Predict by the Methods of Temporal Differences Richard, Sutton 1988, https://pdfs.semanticscholar.org/9c06/865e912788a6a51470724e087853d7269195.pdf

[2] Deep learning — https://en.wikipedia.org/wiki/Deep_learning

[3] LSTM — https://en.wikipedia.org/wiki/Long_short-term_memory

[4] Reinforcement learning — Markov Chain — https://en.wikipedia.org/wiki/Markov_chain

[5] Hdinsight — https://docs.microsoft.com/en- us/azure/hdinsight/hadoop/apache-hadoop-introduction

[6] Azure Databricks — https://docs.microsoft.com/en-us/azure/azure-databricks/

[7] Azure SQL — https://docs.microsoft.com/en-us/azure/sql-database/

[8] Azure functions — https://docs.microsoft.com/en-us/azure/azure- functions/functions-overview

[9] Notification hub — https://docs.microsoft.com/en-us/azure/notification-

hubs/notification-hubs-push-notification-overview

[10] Power BI — https://docs.microsoft.com/en-us/power-bi/service-azure-and- power-bi

[11] Artificial Intelligence. — https://www.microsoft.com/en-us/ai/default.aspx

[12] ARIMA https://en.wikipedia.org/wiki/Autoregressive_integrated_moving_average

© 2018 Rockwell Automation/Microsoft Corporation. All rights reserved. This document is provided “as-is.” Information and views expressed in this document, including URL and other Internet Web site references, may change without notice. You bear the risk of using it.

This document does not provide you with any legal rights to any intellectual property in any Microsoft product. You may copy and use this document for your internal, reference

purposes. You may modify this document for your internal, reference purposes.

Originally published at https://github.com.

--

--